Our Company Has Launched a New Crawler-type Boom Pump for Tunnel and Bridge Projects
September 25, 2025
Advantages:
(1) During the pouring of the inverted arch concrete, it does not affect the slag removal of the palm face construction: This operation method adopts a parallel construction method, that is, while pouring the inverted arch concrete, the palm face can continue to be excavated and slag removed. Through reasonable construction organization and coordination, collaborative construction between two working faces can be achieved, thereby improving overall construction efficiency. This parallel construction method can avoid the time waste and resource allocation problems caused by traditional sequential construction methods.
(2) Flexible fabric placement during construction reduces labor intensity for workers and shortens concrete pouring time. The arm of the equipment can be flexibly moved and adjusted to achieve precise concrete placement. This can avoid the problems of uneven fabric distribution and long adjustment time caused by traditional concrete pouring methods. Meanwhile, pouring concrete through pumping can achieve continuous construction operations, greatly reducing the time required for concrete pouring.
(3) Through boom distribution, compared with the traditional chute construction, it reduces the trouble of workers moving the chute, improves the automation level of tunnel construction, and increases the comfort and safety of workers. The use of intelligent boom can reduce the work intensity of workers for the movement and operation of heavy equipment, and improve the automation level of construction. This can avoid the safety risks and time waste caused by the need for workers to move and adjust heavy equipment in traditional construction. By improving the automation level of construction, the demand for human resources can be reduced and work efficiency can be improved. Meanwhile, workers working in a comfortable environment can also increase their work enthusiasm and productivity.